Name:  Glens Falls Waste Water Treatment Plant

Owner:  City of Glens Falls and Siemens Building Technologies

Design:  Camp Dresser & McKee

Type of Facility:  Waste Water Treatment Plant

Project Manager:  Jason Bruhn

Project Superintendent:  Joseph Salzer

As part of a $9.5 million energy performance contract (Phase I) between Siemens Building Technologies and the City of Glens Falls, BCI provided all construction management and general contracting services for the Phase I project. The self performance work Per BCI included: Reconstruction on two 42’dia. X 25’deep sludge holding tanks by placing a new concrete base and walls within and a new concrete cover on top; new copper pumps, piping and contours within the sludge tank; two new sludge plunger pumps, piping and valves; and two new 3 meter belt filter presses with appurtenances. In addition, BCI managed the replacement of existing motors with new premium efficiency motors, the replacement of the fluidized bed incinerator 250HP motor, and a new SCADA control system.

All work was completed utilizing a phasing plan that kept the existing plant in service at all times.

 

 

 

 

Category List
Back
Glens Falls
Glens Falls
Image Detail Image Download
Glens Falls
Glens Falls
Image Detail Image Download
Glens Falls
Glens Falls
Image Detail Image Download
Glens Falls
Glens Falls
Image Detail Image Download
Glens Falls
Glens Falls
Image Detail Image Download
Glens Falls
Glens Falls
Image Detail Image Download
Glens Falls
Glens Falls
Image Detail Image Download
Glens Falls
Glens Falls
Image Detail Image Download
Glens Falls
Glens Falls
Image Detail Image Download

 

Display Num